THE DIGITAL THREAD
Every requirement, proven
One graph ties requirements to models, parts, software and simulation evidence — and keeps score.
REQUIREMENTS
Requirements that hold up
EARS + INCOSE lint
Every requirement graded against EARS patterns and INCOSE rules, live.
Baselines & redline
Compare any two baselines; see exactly what moved.
Suspect links
Downstream artifacts flip to suspect the moment a requirement changes.
When battery voltage drops below 10.5 V, the controller shall quickly inhibit takeoff.
CLOSED-LOOP VERIFICATION
From requirement to solver to VERIFIED
No spreadsheet in between. The graph is the traceability.
The solver result writes back to the requirement. Coverage flips itself.
IMPACT
Change without fear
ECO-00012 · BLAST RADIUS
Impact traversal
Walk every edge an ECO touches, requirement to test, in one query.
Where-used
Any part, any requirement — see every assembly and program it feeds.
Evidence-stamped links
Every trace carries the build, run, or review that proved it.
EVIDENCE-STAMPED LINKS
Stop trusting spreadsheets with your traceability.
Put the proof in the thread.