THE DIGITAL THREAD

Every requirement, proven

One graph ties requirements to models, parts, software and simulation evidence — and keeps score.

REQUIREMENTS

Requirements that hold up

EARS + INCOSE lint

Every requirement graded against EARS patterns and INCOSE rules, live.

Baselines & redline

Compare any two baselines; see exactly what moved.

Suspect links

Downstream artifacts flip to suspect the moment a requirement changes.

LIVE LINT

When battery voltage drops below 10.5 V, the controller shall quickly inhibit takeoff.

✓ EARS · EVENT-DRIVENVAGUE TERM · “quickly”
REQUIREMENT COVERAGE228 / 246

CLOSED-LOOP VERIFICATION

From requirement to solver to VERIFIED

No spreadsheet in between. The graph is the traceability.

REQ-00028
Requirement
Frame stress ≤ 1 MPa
PRT-01245
CAD model
Bracket assy · rev C
SIM-00008
SimScale run
von Mises within limit
VERIFIED
Coverage closed
Requirement verified

The solver result writes back to the requirement. Coverage flips itself.

IMPACT

Change without fear

ECO-00012 · BLAST RADIUS

Impact traversal

Walk every edge an ECO touches, requirement to test, in one query.

Where-used

Any part, any requirement — see every assembly and program it feeds.

Evidence-stamped links

Every trace carries the build, run, or review that proved it.

EVIDENCE-STAMPED LINKS

Stop trusting spreadsheets with your traceability.

Put the proof in the thread.